Risoil S.A., an agro-industrial group, was expanding the capacity of the «Sunshine Terminal.» Eight new tanks with a volume of 150,000 m3 were put on stream. The total size of the «Risoil» terminal has increased to 350 000 m3
Project manager Yuri Azarenkov
3-months
Performance of work
A key aspect for customer
Compliance with the deadline was fundamental. All work was completed in 3 months.
2 880 m
Cable runway
24 000 m
Cable was routed
45
Electric cabinets were assembled and disconnected
850
Sensors, terminal plates, and controlling points were disconnected
Cable runway
Cable was routed
Electric cabinets were assembled and disconnected
Sensors, terminal plates, and controlling points were disconnected