Our company did electrical work of power equipment, as well as external and internal electrical networks. For a new shop powering, there were performed erection works of internal lighting, and new networks were routed for the existing technological equipment. Installation and disconnection of electric cabinets were also carried out.
Project manager Volodymyr Tverdokhlib
4-months
Performance of work
A key aspect for customer
Full project design and electrical work execution
2 000 m
Cable runway
6 250 m
Cable was routed
17
Electric cabinets were disconnected
Cable runway
Cable was routed
Electric cabinets were disconnected