We started cooperation with TOV "Ligos" in 2015. There were several work stages of existing electric grid reconstruction as well as powering new shop floor and office building.
Project manager Volodymyr Tverdokhlib
2015-2019
Cooperation period
A key aspect for customer
Due to the production lines suspension, we must follow the schedule to minimize business expenditure
300 m
Cable runway
13 420 m
Cable was routed
33
Electric cabinets were assembled and disconnected
Cable runway
Cable was routed
Electric cabinets were assembled and disconnected