Quotation for industrial enterprises

Home / Company / Quotation for industrial enterprises

Illustration

Electrical grids reconstruction for industrial enterprises

Complex electrical work for TOV "Ligos"

We started cooperation with TOV "Ligos" in 2015. There were several work stages of existing electric grid reconstruction as well as powering new shop floor and office building.

Project manager Volodymyr Tverdokhlib

Illustration

    Ivano-Frankivsk

Numbers

  • icon

    2015-2019

    Cooperation period

A key aspect for customer

Due to the production lines suspension, we must follow the schedule to minimize business expenditure.

icon

300 m

Cable runway

icon

13 420 m

Cable was routed

icon

33 шт

Electric cabinets were assembled and disconnected

icon

300 m

Cable runway

icon

13 420 m

Cable was routed

icon

33

Electric cabinets were assembled and disconnected

Complex electrical work for PJSC "Vinnytsapobuthim"

Our company received a request from PJSC "Vinnytsapobuthim" for electrical work. The reconstruction of external power supply networks and the installation of supply transformers and distribution circuits were requested.

Project manager Volodymyr Tverdokhlib

Illustration

    Vinnytsa

Numbers

  • icon

    6-month

    Performance of work

A key aspect for customer

The customer wished to optimize production capacity without any losses for the technological process.

icon

250 m

Cable runway

icon

1 650 m

Cable was routed

icon

2

Siemens Transformers 1000 кVA

icon

1

Power distribution station-0,4 хEnergy (ЕATON) 2000 А

icon

250 m

Cable runway

icon

1 650 m

Cable was routed

icon

2

Siemens Transformers 1000 кVA

icon

1

Power distribution station-0,4 хEnergy (ЕATON) 2000 А

Complex electrical work for Tov "Morgan Furniture"

"Morgan Furniture" plant in Rivne needed reconstruction of an electrical grid in the existing shop to start a new production. Also, we did electrical work in the new warehouse.

Project manager Volodymyr Tverdokhlib

Illustration

    Rivne

Numbers

  • icon

    4-month

    Performance of work

A key aspect for customer

Compliance with the deadline was fundamental as there were other construction and technical activities.

icon

1 000 m

Cable runway

icon

26 900 m

Cable was routed

icon

20

Electric cabinets were assembled and disconnected

icon

350

Illumination and installations devices were installed

icon

1 000 m

Cable runway

icon

26 900 m

Cable was routed

icon

20

Electric cabinets were assembled and disconnected

icon

350

Illumination and installations devices were installed

Illustration

Still, have questions?

Need a free consultation?

Would you like to talk about cooperation or get a detailed consultation?
Do it in any way convenient for you.