We started cooperation with TOV "Ligos" in 2015. There were several work stages of existing electric grid reconstruction as well as powering new shop floor and office building.
Project manager Volodymyr Tverdokhlib
2015-2019
Cooperation period
A key aspect for customer
Due to the production lines suspension, we must follow the schedule to minimize business expenditure.
300 m
Cable runway
13 420 m
Cable was routed
33 шт
Electric cabinets were assembled and disconnected
Cable runway
Cable was routed
Electric cabinets were assembled and disconnected
Our company received a request from PJSC "Vinnytsapobuthim" for electrical work. The reconstruction of external power supply networks and the installation of supply transformers and distribution circuits were requested.
Project manager Volodymyr Tverdokhlib
6-month
Performance of work
A key aspect for customer
The customer wished to optimize production capacity without any losses for the technological process.
250 m
Cable runway
1 650 m
Cable was routed
2
Siemens Transformers 1000 кVA
1
Power distribution station-0,4 хEnergy (ЕATON) 2000 А
Cable runway
Cable was routed
Siemens Transformers 1000 кVA
Power distribution station-0,4 хEnergy (ЕATON) 2000 А
"Morgan Furniture" plant in Rivne needed reconstruction of an electrical grid in the existing shop to start a new production. Also, we did electrical work in the new warehouse.
Project manager Volodymyr Tverdokhlib
4-month
Performance of work
A key aspect for customer
Compliance with the deadline was fundamental as there were other construction and technical activities.
1 000 m
Cable runway
26 900 m
Cable was routed
20
Electric cabinets were assembled and disconnected
350
Illumination and installations devices were installed
Cable runway
Cable was routed
Electric cabinets were assembled and disconnected
Illumination and installations devices were installed