Subcontracting work with the «S-Engineering» company! Risoil S.A., an agro-industrial group, was expanding the capacity of the «Sunshine Terminal.» Eight new tanks of 150,000 m3 were put on stream. The total size of the «Risoil» terminal has increased to 350 000 m3.
Project manager Yurii Azarenkov
3 months
Performance of work
A key aspect for customer
Compliance with the deadline was fundamental. All work was completed in 3 months
2 880 m
Cable runway
24 000 m
Cable was routed
45
Electric cabinets were assembled and disconnected
850
Sensors, terminal plates, and controlling points were disconnected
Cable runway
Cable was routed
Electric cabinets were assembled and disconnected
Sensors, terminal plates, and controlling points were disconnected
At the same time as the third stage of work started on «Sunshine Terminal», there were «Risoil» terminal reconstruction work to increase capacity.
Керівник проекту Юрій Азаренков
1 month
Performance of work
A key aspect for customer
Compliance with the deadline was fundamental.
All work was completed in 1 month
1 100 m
Cable runway
800 m
Cable was routed
20
Electric cabinets were assembled and disconnected
150
Sensors, terminal plates, and controlling points were disconnected
Cable runway
Cable was routed
Electric cabinets were assembled and disconnected
Sensors, terminal plates, and controlling points were disconnected
Our company received a request from Private Agro Company "Vilkhivtsi" for an interior electrical network solution design and implementation.
The customer created a transparent technical inquiry demanding to power electric cabinets and connect the aeration fan.
Project manager Oleg Romanets
2 weeks
Performance of work
A key aspect for customer
Compliance with the deadline was fundamental as there were other construction and technical activities.
350 m
Cable runway
1 390 m
Cable was routed
40 шт
Electric cabinets were assembled and disconnected
35 шт
Sensors, terminal plates, and controlling points were disconnected
Cable runway
Cable was routed
Electric cabinets were assembled and disconnected
Sensors, terminal plates, and controlling points were disconnected